top of page
Electricity substation gantries and insulators silhouetted against a sunset

Utility works security in the public realm

Compact towers that fit a single bay and watch the works when the crew's gone home.

Water, gas, power and telecoms works are temporary, public-facing and often unmanned overnight: an excavation behind barriers, plant on the verge, cable drums on the pavement. SiteGuard's Compact tower fits a single parking bay, needs no power connection and gives the operator a live view of the works, with a speaker to warn off trespass before someone gets hurt.

Streetworks and utilities security that fits inside the traffic management (TM) layout

What goes wrong on utility works

Public trespass into excavations. Cable and copper theft. Plant and generator theft. Barrier and signage tampering. Reputational and regulatory consequences of a public-realm incident.

How SiteGuard protects utility works

Compact tower within the works footprint; PIDs for longer linear schemes and compounds. Re-sited with each phase of the works.

High-voltage pylon and power lines in front of a gas-fired power station at dusk

What we deploy on utility works

SiteGuard CCTV trailer tower with its camera mast raised and solar panel angled to the sun

CCTV tower hire for utilities

The 4.5m Compact inside the works footprint or traffic management layout, needing no power or broadband.

SiteGuard PID perimeter intrusion detection unit with solar panel and red strobe on site, with a JCB access platform behind

Perimeter intrusion detection for utilities

Wireless PID units along longer linear schemes and at compounds, re-sited as the works progress. Each one photographs, sounds an alarm and flashes a red strobe the moment someone crosses.

CCTV operator watching a wall of live camera feeds in a monitoring control room

24/7 monitoring for utility works

Every activation at the excavation or compound is checked live by a trained operator, who can warn the public away through the tower's speaker before anyone gets hurt. Monitoring is included with every hire.

Utilities works security across the North and nationwide

Streetworks and utilities compounds across Yorkshire, the Humber and North Lincolnshire are same-day; anywhere else in the UK is within 24 hours, with the Compact tower that fits inside your traffic management (TM) layout.

Beverley & the East Riding

Our home yard. Housing, industrial estates, Wolds farms and town-centre property across the East Riding, on site within hours of your call.

Hull & East Yorkshire

Twenty minutes from our Beverley yard. Port yards, Freeport compounds, housing on the city’s edge and the farms of Holderness, usually set up the same day.

York & North Yorkshire

Under an hour from Beverley. York Central, the ring road works, phased housing and the farms of the Vale, usually the same day.

Leeds & West Yorkshire

An hour and a quarter down the M62. City-centre towers, logistics parks, housing and vacant commercial property, usually the same day.

Scunthorpe

Thirty-five minutes from our yard. Steelworks contractors, quarries, solar farms and arable land across North Lincolnshire, same day.

Grimsby

Forty minutes over the Humber Bridge. Port yards, offshore wind compounds, processing sites and housing around Grimsby and Immingham, same day.

Nationwide

Anywhere in mainland UK within 24 hours of your go-ahead. One account manager, one set of terms, and the same kit and monitoring on every site, however far from Beverley.

Utilities site security: your questions answered

Can the tower sit inside a traffic management layout?

Yes. The Compact tower fits a single parking bay or a verge and can be placed inside the works footprint behind your barriers, so it doesn't need its own TM. Send us the TM plan and we'll position it where it watches the excavation and plant without obstructing the working area or the footway.

Do you need a permit?

It depends on where the unit sits. Inside your permitted works area it's usually covered by your permit as site equipment; on the carriageway or footway outside it, the authority may want it listed. We'll advise and provide the unit's dimensions and details for the application.

How quickly can you move it?

With notice, we re-site the same day as the works move, so the tower follows the excavation along a linear scheme. Relocation isn't part of the hire charge; it's priced separately and set out in your quote. For schemes that move daily, we can agree a schedule and price in advance so our engineer is there when the crew sets up the next section.

Secure your utility works this week

Send us the works location and your TM plan and we'll quote today, with a tower positioned to fit inside your barriers.

bottom of page